[Note - Contract claims are available on the MyConstruct Studio plan]
This guide uses Sage Intacct. Contract Claims also works with Xero in much the same way; a Xero-specific guide is coming soon.
Bill a building contract stage by stage, from the first deposit through to 100%. You enter the contract price, an optional deposit, and the claim stages once per job. After that, every time the job reaches a stage you raise a claim, and MyConstruct keeps a running total of what has been billed.
|
Feels familiar? Raising a claim uses the same Generate Invoice screen you already use for progress invoices on quotes. The Contract Claim tool is a quick way to set the job up from a contract price instead of an estimate. |
On this page
- Before you start
- Words you'll see
- 1. Open the Contract Claim tool
- 2. Enter the contract details
- 3. Link the Sage Customer ID
- 4. Enter the contract price and deposit
- 5. Set out the claim stages
- 6. Save the contract
- Jobs that moved across part-way through
- Troubleshooting and FAQ
Before you start
- You need a job for the customer. Each job has one contract; if the job already has one, MyConstruct opens it rather than starting a second one.
- Have the agreed contract price (excluding GST - MyConstruct adds GST for you) and, if you take one, the deposit as a fixed dollar amount.
- If you use Sage Intacct, have the customer's Sage Customer ID (your office code, for example the first letters of the surname and a number).
- If the job moved across from CRE part-way through a contract, see Jobs that moved across part-way through.
Words you'll see
| Term | Meaning |
|---|---|
| Contract price | The total price agreed with the customer, entered excluding GST. |
| Deposit | A fixed dollar amount you ask for up front. It is not extra money on top of the contract - it is the first part of the first stage. |
| Claim stage | A milestone such as Base, Frame or Lockup, with the percentage of the contract you bill when it is reached. |
| Claim | The invoice you raise for one or more stages. In MyConstruct, claims are listed after the contract as 123476.1, 123476.2 and so on. Once a claim is sent to Sage Intacct, Sage gives it its own invoice number, and that is the number printed on the invoice. |
| Sage Customer ID | Your office's code for the customer in Sage Intacct. It prints on every claim. |
| Template | A saved set of claim stages you can reuse on every job. |
1. Open the Contract Claim tool
In the left-hand menu, go to Quotes → Contract Claim.
If you start from a job, the job and the customer are filled in for you.
2. Enter the contract details
- Enter a Contract No and Contract Name.
- Choose the Job and the Contact.
3. Link the Sage Customer ID
Under Contact Name, enter the Sage Customer ID your office uses, then click Check.
If the customer is not in Sage Intacct yet, enter a new code (surname letters plus a number). MyConstruct suggests the next free code, and can list existing codes with the same surname so you don't create a duplicate. If they're already linked, you'll see the code with a Change button.
4. Enter the contract price and deposit
- Enter the Contract price excluding GST.
- If you take a deposit, enter it as a fixed dollar amount. Leave it at 0 if you don't take one - the first claim is then simply the first stage.
The deposit is not charged on top of the contract price. It is the first part of the first stage.
5. Set out the claim stages
Set the stages as percentages that add up to 100%, or pick a ready-made template (for example a standard residential build). You can save your own templates to reuse on every job.
6. Save the contract
Click Save. The contract is now on the job, and you can raise claims as stages are reached.
Jobs that moved across part-way through
Some jobs were part-way through when they moved from CRE to MyConstruct and Sage Intacct. They came across with only the stages already invoiced (usually just the deposit), so there was no next stage to claim. Here's how to carry on.
|
Already done for you We've added the missing stages, with their CRE amounts, to the jobs we found. If you open one of those jobs, go straight to step 3. Invoices you've already raised don't change, and nothing goes to Sage until you claim a stage. |
1. Spot a job with stages missing
Go to Quotes → Contract Claim (or Generate Invoice).
A Stages missing banner tells you how much of the contract has no claim stage yet. What's already invoiced stays as it is. Click Add remaining stages to open the window in the next step.
|
Check Sage first If a later stage was already invoiced straight in Sage, match it under Invoices → Manage Invoices (Match Sage invoices to a job), or use Check Sage on the contract, instead of adding that stage here. Adding it again would bill it twice. |
2. Add the remaining stages
In the Add remaining stages window:
- The full contract value (excluding GST) is shown. Change it if it isn't right.
- A stage that was billed in two parts (such as an initial and a balance deposit) is raised to what's been billed. It can't go lower than that.
- The stages still to come are suggested from your claim template. Change any name or amount to match the contract.
- Click Add a stage if you need another one. Use the red × to remove one.
- Keep going until it says Adds up - the stages must equal the contract value.
- Click Save stages (next to Cancel). No invoice is raised at this point.
3. Claim the next stage
The next stage to claim shows Next claim. Click Save & Claim. You can also use Manage Quotes → Generate Invoice.
4. Generate the invoice and send it to Sage
On the Generate Invoice screen, the next stage is ticked for you, at the right amount. Click Generate Invoice, then send it to Sage from Manage Invoices as normal. Claim each later stage the same way when it's due.
|
Good to know Changing the contract value on its own doesn't create any invoices. Each stage is claimed one at a time, like any other job. |
Troubleshooting and FAQ
Do I have to take a deposit?
No. Leave the Deposit at 0 and the first claim is simply the first stage.
Is the deposit charged on top of the contract price?
No. It is the first part of the first stage.
Can I change the price or the stages after I've started claiming?
You can adjust what's left to claim, but stages that have already been invoiced stay as they were.
The customer isn't in Sage Intacct yet. What do I do?
Enter a new Sage Customer ID on the contract and Check. MyConstruct will help you create them, and suggests the next free code.
How do I set up my own stages for every job?
Build the schedule once and save it as a template, then pick that template on each new contract.
The job came across mid-contract and only has the stages that were already invoiced. What do I do?
See Jobs that moved across part-way through. Add the remaining stages so they add up to the contract value, then claim the next one as usual. If a later stage was already invoiced in Sage, match it under Manage Invoices instead of adding it again.
Need a hand? Contact our support team.
Comments
0 comments
Article is closed for comments.