[Note - Contract claims are available on the MyConstruct Studio plan]
This guide uses Sage Intacct. Contract Claims also works with Xero in much the same way; a Xero-specific guide is coming soon.
Once the contract is set up, raise a claim each time the job reaches a stage, release it to Sage Intacct, and keep the progress bar up to date. If someone raises an invoice straight in Sage, MyConstruct can match it back to the job so nothing is counted twice.
On this page
- 1. Raise a claim
- 2. Generate and check the invoice
- 3. Release the claim to Sage Intacct
- 4. Repeat until the contract is fully claimed
- Matching Sage invoices back to a job
- Auto-reconcile
- Troubleshooting and FAQ
1. Raise a claim
Open the job's contract from Quotes → Contract Claim, or from the job. Tick the stage (or stages) that have been reached, then click Generate Invoice.
You can also start from a quote's invoice options - both take you to the same place.
|
Can I claim more than one stage at a time? Yes. Tick every stage that has been reached. The claim covers them together, and the progress bar updates for all of them. |
2. Generate and check the invoice
The claim is created as an invoice on the job. Check the printout: invoice number, claim stage, customer, job, amounts and GST. If bank details are missing, add them in your invoice or stationery settings so they print on the claim.
Until you release the claim to Sage Intacct it may be marked Draft - not yet released to Sage. Print it again after you release it, so it shows Sage's invoice number.
3. Release the claim to Sage Intacct
Open the invoice and follow the release wizard. Check Sage first if you want to see how this claim lines up (already linked, safe to send, or came from Sage - do not send back).
If the client has no address, enter it when prompted so the invoice prints with one. It is saved on the client and on the Sage customer.
Once released, your accounts team sees the claim in Sage Intacct as a normal customer invoice. The claim is then locked from being sent again.
4. Repeat until the contract is fully claimed
The next time a stage is reached, open the contract and raise the next claim. The progress bar in Manage Quotes shows how much of the contract has been billed. Continue until the job is 100% claimed.
Matching Sage invoices back to a job
MyConstruct and Sage Intacct are linked, so information flows both ways. Claims you raise in MyConstruct are sent across with Release to Sage. If someone raises a customer invoice directly in Sage Intacct, MyConstruct picks it up and lets you place it against the right job, so the progress bar still adds up.
Invoices that MyConstruct can't place by itself wait in an orange Match Sage invoices to a job panel at the top of Invoices → Manage Invoices. It starts folded, showing how many are waiting. Click the bar (or Show) to open the list.
- The badge shows how many Sage invoices still need a home.
- In Match to job, start typing the job number or name, then pick the job. The invoice is added to that job's contract as a claim. Use Ignore for anything that doesn't belong in MyConstruct; it stays in Sage Intacct.
- Tick several invoices to combine them into one claim - useful when accounts raised one stage as two or three invoices. MyConstruct then asks which claim stages they cover.
- Hide folds the panel away again.
- Auto-reconcile… matches the easy ones for you (see below).
Scan Sage AR looks back through Sage Intacct for older invoices: pick a date range and click Preview, or Scan now to bring them in.
|
Good to know Invoices that came from Sage Intacct are marked as such inside MyConstruct and are never sent back to Sage, so you can't accidentally create a duplicate. |
Auto-reconcile
Most Sage invoices are easy to place: the Sage project is linked to a job and the invoice matches a claim stage to the cent, or it is already on a claim. Auto-reconcile finds those for you.
- Safe to auto (green): ticked for you. MyConstruct is sure where these go.
- Need your OK (amber): a likely match, for example the stage name matches but the amount doesn't. Off until you tick them.
- Leave for manual (grey): MyConstruct can't tell. They stay in the list for you to match by hand.
Nothing is saved until you confirm. Click Apply safe matches only, or review and confirm after ticking any amber ones you agree with.
Once a day, MyConstruct also applies the safe matches automatically. Amber and grey invoices are never matched automatically.
Troubleshooting and FAQ
Someone in accounts raised an invoice straight in Sage Intacct. What do I do?
Open Invoices → Manage Invoices and use the Match Sage invoices panel, or Auto-reconcile, to place it on the job.
Why does my claim say “Draft - not yet released to Sage”?
Release it to Sage (step 3) and print it again, so it shows Sage's invoice number.
The customer's name is cut short or says “Unnamed customer”.
Check the contact and the Sage Customer ID on the contract, and that the Sage customer has a name and address.
There are no bank details on my claim.
Add them in your invoice or stationery settings, then print the claim again.
Why are my deposits called Initial Deposit Claim and Balance Deposit Claim?
The first deposit claimed on a contract is the Initial Deposit Claim; a second one is the Balance Deposit Claim. The same name is used in MyConstruct, on the printout and in Sage Intacct.
Do I still need to click Auto-reconcile?
Only for amber or grey invoices. Safe matches are applied automatically once a day.
Where do variations go?
Variations can be claimed with or after a stage, depending on how you've set the contract. If a variation is missing, check it has been added to the contract.
The job only has the stages that were already invoiced (for example just the deposit).
The job likely moved across from CRE part-way through. See Setting up a contract claim - Jobs that moved across part-way through. Don't add a stage that was already invoiced in Sage, or it will be billed twice.
Need a hand? Contact our support team.
Comments
0 comments
Article is closed for comments.