Move your teams off BuilderMT onto MyConstruct: run both systems side by side, avoid double entry, then cut over construction files, scheduling and checklists, and estimating orders.
Bridge is available on Studio, on request (optional feature switched on for your account). Estimating is available on the Pro and Studio plans.
Bridge works with all versions of BuilderMT. We run the connection with you. For the product overview, see BuilderMT: migrating to MyConstruct and the Bridge product page. If you also use the on-premise version of Sage Estimating, that can stay: Bridge can pick up quantities from it (Sage's cloud estimating is not supported).
On this page
- The goal
- Running side by side
- The double-entry problem, and the ways out
- The three moves that let you retire BuilderMT
- Sage Estimating (on-premise)
- On the day: cutting over
- What stays, and what happens next
- Questions to settle before you cut over
The goal
Move every team off BuilderMT so the day-to-day work lives in MyConstruct (and, if you use them, your estimating tool and your accounting system). Enter each job, client and supplier once. Switch BuilderMT off when the teams have signed off, and keep a backup of its data.
Many businesses reach this in stages: accounting and claims may already have moved, while jobs, files, schedules and purchase orders still start in BuilderMT. This page is about finishing that move.
Running side by side
Until BuilderMT is retired, agree where each thing is entered, so nobody types it twice unless they have to.
| What | Where it is entered today | What happens next |
|---|---|---|
| New job, new client | BuilderMT | MyConstruct picks them up through Bridge |
| New supplier | Your agreed system (often accounts first) | MyConstruct picks it up so it can be used on jobs and orders |
| Lead or opportunity | MyConstruct | When it becomes a job, the job may still need to be created in BuilderMT until you cut over; the two then link |
| Estimate and quantities | Your estimating tool (for example the on-premise version of Sage Estimating), or BuilderMT | Pushed to BuilderMT today; after the estimating move, MyConstruct picks up the quantities |
| Purchase orders | BuilderMT | MyConstruct picks them up and can send them on to your accounting system |
| Checklists and schedules | BuilderMT | Copied into MyConstruct; after the scheduling move, work in them there |
| Job files (plans, specs) | A shared drive and/or BuilderMT | This moves to MyConstruct as part of the construction move |
| Progress claims | MyConstruct, if you have already moved claims | Sent on to your accounting system |
If you are not sure where something goes, ask before entering it twice. If something looks out of step between the systems, tell support rather than fixing it in two places.
The double-entry problem, and the ways out
Leads and opportunities are often worked in MyConstruct, but a job may still have to be created in BuilderMT so estimating can order against it. Until that changes, some details are typed twice. There are two practical ways forward.
Live with it until BuilderMT is retired
Keep the rule above: the lead or opportunity is in MyConstruct, and the job, client and supplier are created in BuilderMT. MyConstruct links them up. Nothing new to build or test; the cost is some typing twice until the teams have moved.
Retire BuilderMT (recommended)
Move the three teams that still use BuilderMT across to MyConstruct, then switch it off. Once it is gone, MyConstruct is the only place to enter a lead, job, client or supplier, and double entry ends for good. Agree your own dates with your team, and cut over when they are ready.
The three moves that let you retire BuilderMT
Three teams typically still rely on BuilderMT. When all three have moved, it can be switched off.
1. Construction (supervisors): job files and call-ups
Today. Job files often live on an office shared drive and are collected from BuilderMT. Supplier call-ups may still be done on paper or by phone.
After the move. The office uploads files for jobs already in construction, then every new job going forward (you can drag and drop a folder at a time). Supervisors open them in MyConstruct, on site or in the office. Call-ups go out from MyConstruct instead of paper.
2. Scheduling and checklists
Today. Checklists and schedules are kept in BuilderMT. They already copy into MyConstruct (one way) when Bridge is connected.
After the move. Work in them straight in MyConstruct. There is usually nothing extra to migrate: the data is already there. This can often begin as soon as the team is comfortable in MyConstruct.
3. Estimating: purchase orders
Today. Quantities may be pushed from your estimating tool into BuilderMT, and estimators issue every order from BuilderMT (site often calls the office for extras).
After the move. If you use the on-premise version of Sage Estimating, it can stay: MyConstruct picks up the quantities. Orders are issued from MyConstruct and go on to your accounting system as they do today. Learn, test and sign off before the switch.
Sage Estimating (on-premise)
If you use the on-premise version of Sage Estimating, it can stay when you leave BuilderMT: MyConstruct can pick up the quantities, and you can keep estimating there. Bridge can connect to the on-premise version of Sage Estimating only, not Sage's cloud estimating.
On the day: cutting over
BuilderMT is cut off as it stands, after one final sync, and MyConstruct picks up where it left off, even on jobs that are part-way through. It is cleaner to pick a point where open jobs are ordered up to a stage, so no job has half its orders in each system. BuilderMT's data is then archived as a backup (it is already in MyConstruct).
What stays, and what happens next
Stays. MyConstruct: leads, jobs, clients, orders, files, schedules, call-ups, checklists and claims. Your estimating tool, if you are keeping it (there is no need to leave the on-premise version of Sage Estimating). Your accounting system, with orders and claims flowing into it.
Goes. BuilderMT, once the three teams have moved and signed off. Its data is archived as a backup.
Next steps:
- Agree the move order and dates for the three teams, and settle the questions below.
- Scheduling and checklists: start working in MyConstruct. This can begin now if the data is already there.
- Construction: the office uploads files for jobs in construction now, then every new job; call-ups move to MyConstruct.
- Estimating: run a test period issuing orders from MyConstruct, then sign off.
- Sign-off from each team that they no longer need BuilderMT.
- Final sync, cut over at an agreed stage, archive BuilderMT's data and switch it off.
Until then, keep entering jobs, clients and suppliers in the system you agreed, and leads in MyConstruct. If something looks out of step, tell us rather than fixing it in two places.
Questions to settle before you cut over
These need an answer before estimating stops using BuilderMT. None of them stop the other moves.
| Topic | The question |
|---|---|
| Budgets | Where do job budgets come from once BuilderMT is gone? |
| Supplier on the order | When the supplier changes from a placeholder trade to the real one, is that done in MyConstruct, or in your estimating tool? |
| Order prices | Do estimating prices go straight onto the order, or is there another price level or adjustment first? |
| Cut-off point | When do we cut over? Any time works; it is tidier when open jobs are ordered up to a stage. |
| Job files | Who uploads files for jobs already in construction, and by when? |
If your business also uses Databuild, the same Bridge approach applies: see Exporting and migrating data from Databuild to MyConstruct and Connecting MyConstruct to Databuild with Bridge.
Need a hand? Contact MyConstruct support.
Related articles
- BuilderMT: migrating to MyConstruct
- Exporting and migrating data from Databuild to MyConstruct
- Connecting MyConstruct to Databuild with Bridge
- Guide to creating your first Estimate
- Sending and managing Purchase Orders
- Job scheduling using Checklists and Gantts
- Building a checklist
- Calling up trades
- Enterprise (MyConstruct Studio)
- Training and setup services
Databuild and BuilderMT are trademarks of their respective owners. MyConstruct is not affiliated with or endorsed by Databuild or BuilderMT.
Comments
0 comments
Article is closed for comments.