See where Databuild cost centres, price files, recipes, assemblies, bills of quantities, schedules and purchase orders land in MyConstruct, field by field, when you move with Bridge or Import from Databuild (XML).
Import from Databuild (XML) is available on the Pro and Studio plans. Bridge is available on Studio, on request (optional feature switched on for your account). Macros, QGen and text variables are also available on Studio, on request (optional feature switched on for your account).
If you have used Databuild for years, the words are familiar but they sit in different places in MyConstruct. This page maps one to the other. For the steps of the move itself, see Exporting and migrating data from Databuild to MyConstruct. For Bridge in general, see Moving from Databuild to MyConstruct with Bridge and the Bridge product page.
On this page
- In short
- The order things move in
- Cost centres
- Price files and inventory
- Recipes and assemblies
- Jobs and clients
- Schedules
- Bills of quantities and purchase orders
- Macros, QGen and text variables
- Databuild and Xero
- What isn't mapped
- Run it again safely
In short
- Your price list becomes inventory, and your price levels become pricing areas.
- Your recipes and assemblies keep their structure: the parent becomes a formula item and each ingredient is a row. They move with Bridge.
- Each job's bill of quantities becomes an estimate linked to the job, and historical orders are stamped on its lines.
- Schedules come across with the job and stay in sync (Bridge).
- Debtors become clients (Bridge).
- Preferred (nominated) suppliers on a cost centre become the cost centre's Default Suppliers.
The order things move in
| Databuild | MyConstruct | Route |
|---|---|---|
| Suppliers | Suppliers (contacts) | Bridge, or CSV then XML |
| Price list (PriceList), units (PerCodes) | Inventory items and units | Bridge or XML |
| Contacts marked as debtors | Clients (couple names are split) | Bridge, or CSV |
| Jobs | Jobs linked to the client | Bridge |
| Recipes and assemblies | Recipes (parent formula item plus ingredient rows) | Bridge |
| Bills of quantities | An estimate per job, with its bill lines | Bridge or XML (one job at a time) |
| Orders and order details | Purchase order details stamped onto the estimate lines, shown as Sent | Bridge |
| Schedules | Schedules on the job, kept in sync | Bridge |
| Cost centre colours per job | Cost centre colours per job | Bridge |
| Macros | Macros, run from an estimate's Macros button | XML (Studio, on request) |
| Job variables (text and numbers) | Text variables and estimate variables | Bridge or XML (Studio, on request) |
Cost centres come across with the catalogue and estimates.
Cost centres
In MyConstruct, a cost centre is a category of inventory items (a folder, such as white goods). Cost centres can be grouped by work stages. Bridge brings your Databuild cost centre codes and names across, in your Databuild order. On the XML route you choose the list to import into; sub-groups become work stages.
| Databuild | MyConstruct |
|---|---|
| Cost centre code and name | Cost centre code and name |
| Sort order | Same order (on Bridge, cost centres with the same sort number are ordered by code) |
| Sub-group | Work stage (XML import; tick Create missing work stages) |
| Nominated (preferred) supplier on a cost centre | Default Suppliers |
See What is a Cost Centre? and Manage Cost Centres.
Review the codes, names, work stages and default suppliers, then press Import: New cost centres. Codes already in the list are left out.
Price files and inventory
Your Databuild price list becomes MyConstruct inventory. Price levels become pricing areas, which store different rates (for example, one area for a metro rate and another for a regional rate). Price level 1 is the first pricing area; later levels come in as "Price level N (Databuild)". You can rename these areas.
| Databuild | MyConstruct |
|---|---|
| Price code | Item code |
| Description | Item name |
| Unit (PerCode) | Unit |
| Template / specification | Item notes ([hide] is kept) |
| Price valid today at the price level you choose | The item's price in the pricing area you choose, dated with Databuild's Valid From date |
| Other price levels | Pricing areas named "Price level N (Databuild)" |
| Supplier prices | Supplier prices on the item |
| Unit price | Unit price, rounded to cents (Databuild keeps four decimal places) |
Not brought across: price list pictures, and prices that are not yet valid (a future Valid From date is used from that date). Archived items and recipes are left out of the XML import. See Setting up Inventory for the first time and Manage Pricing Areas.
Other Databuild price levels become pricing areas. Choose one as the estimate's Pricing Area to price at that level.
Recipes and assemblies
In MyConstruct, a recipe is a group of inventory items used to estimate an area, length or item with many parts. You can explode a recipe so every ingredient is added to the estimate.
Each Databuild recipe or assembly becomes a MyConstruct recipe. The parent item is created as a formula item, with a row for each ingredient. Check your most-used recipes and assemblies first after the move. See What is a Recipe and how do they work? and Manage Recipes.
Recipes and assemblies move with Bridge. The XML import leaves recipes out.
Jobs and clients
| Databuild | MyConstruct |
|---|---|
| Debtor (contact marked as debtor) | Client; couple names split into two |
| Debtor name | Job name |
| Job number | Job number |
| Site address | Site address |
| Job status, supervisor, salesperson | Set the first time the job comes across and not overwritten on later runs, so edits you make in MyConstruct stay |
| Contract price | Keeps refreshing on later runs |
Suppliers are matched on the supplier code (Bridge). A supplier already in MyConstruct is only updated where Databuild has a value. On the XML route, suppliers are matched by name, so add them first. In MyConstruct they sit in contacts. See Contacts and Groups and Importing your contacts.
Schedules
Schedules come across with the job and stay in sync when you use Bridge. Both Databuild schedules and assemblies come across.
Bills of quantities and purchase orders
| Databuild | MyConstruct |
|---|---|
| Bill line: item code, quantity, unit price, price, cost centre | Estimate line with the same fields |
| Load | Delivery |
| Workup | Line notes |
| Variation line | Left out of the XML import unless you tick Include variation lines; brought across with Bridge |
| Order number, date, supplier, delivery | Stamped on the estimate line, shown as Sent (Bridge) |
Not brought across: Bill Authorised/Declined and order receipt quantities. For the estimating workflow after the move, see Guide to creating your first Estimate, Coming from Databuild: the estimate screen, Sending and managing Purchase Orders and Logging Bills against Orders. The product pages are estimating in MyConstruct and purchase orders.
1. Connected to Databuild. 2. Switch to editor opens the estimate in MyConstruct. 3. The bill lines, read from Databuild while the automatic copy is on.
Macros, QGen and text variables
Macros, QGen and text variables are available on Studio, on request (an optional feature switched on for your account). On Studio, you can set the preferred formula syntax (in Business Settings) to Databuild, Excel or Sage, so variables match the way you worked in Databuild. Macros, QGen and text variables need the formula syntax set to Databuild. Ask support to switch this on for your account.
| Databuild | MyConstruct |
|---|---|
| Macros | Macros, from an estimate's Macros button. Brought across with the XML importer, not by Bridge |
| QGen / Generate Quantities | QGEN box on each line, then Multi Select > Generate Quantities (QGen). Comes across with the bill once the feature is on |
| Text variables ({name} in the workup) | Text variables ({name} in the notes), under Variables > Text Variables |
| Job variables (numbers) | The estimate's variables |
See Coming from Databuild: the estimate screen for how these work in the estimate screen.
Databuild and Xero
If Databuild fed your accounts, connect Xero in MyConstruct before you raise live invoices or bills. See Syncing with Xero and the Xero integration. MyConstruct is not an accounting or payroll system. Keep your Databuild reports and a full backup, and ask your accountant about opening balances.
What isn't mapped
- Bill Authorised/Declined flags
- Price list pictures
- Order receipt quantities
- Unit price precision beyond cents
- Recipes, from the XML import (use Bridge, or ask support)
- Databuild users and permissions (set up your team in MyConstruct)
- Accounts, timesheets and payroll
Run it again safely
Re-runs are safe and do not create duplicates. Until cut-over, we can re-run a Bridge copy as needed. Anything that did not come across cleanly can be re-run; the rest of the batch is not affected. On the XML route, loading the same file again leaves out cost centres and items you already have. At cut-over MyConstruct becomes your source of truth, and nothing is deleted.
Related articles
- Exporting and migrating data from Databuild to MyConstruct
- Connecting MyConstruct to Databuild with Bridge
- Import from Databuild (XML)
- Getting your data out of Databuild
- Coming from Databuild: the estimate screen
- Moving from Databuild to MyConstruct with Bridge
- BuilderMT: migrating to MyConstruct
- What is a Cost Centre?
- Manage Cost Centres
- Setting up Inventory for the first time
- Manage Pricing Areas
- What is a Recipe and how do they work?
- Manage Recipes
- Guide to creating your first Estimate
- Sending and managing Purchase Orders
Databuild is a trademark of its respective owner. MyConstruct is not affiliated with or endorsed by Databuild.